GSE News & Articles

Articles about technology, manufacturing, and IT infrastructure.

Latest Articles

Planned Disk Replacement for Wear: SMART Thresholds and Warehouse
8 min
Planned Disk Replacement for Wear: SMART Thresholds and Warehouse
Planned disk replacement for wear: which SMART metrics and thresholds to choose, how to configure alerts and tie them to inventory to avoid sudden failures.
planned disk replacement for wearSMART thresholds for HDD and SSD
PKI Server: signing capacity, redundancy and HSM considerations for getting started
8 min
PKI Server: signing capacity, redundancy and HSM considerations for getting started
How to choose a PKI server: estimate signing load, calculate peak issuance, the role of HSM, redundancy options and readiness checks.
PKI servermass certificate issuance
LLM Data-Leak Test: Internal Checks and Guardrails
8 min
LLM Data-Leak Test: Internal Checks and Guardrails
An LLM data-leak test helps find exposed passwords, keys and personal data. A practical plan for internal testing, metrics and technical protections.
LLM data-leak testprompt injection
Migrating to Linux Desktops in a Government Organization: Implementation Plan
8 min
Migrating to Linux Desktops in a Government Organization: Implementation Plan
Migrating to Linux desktops in a government organization: a step‑by‑step plan for choosing a distribution, building an image, training, support and readiness criteria for departments.
migrating to Linux desktops in governmentchoosing a Linux distribution for the public sector
Data migration plan to IBM FlashSystem 7300 without surprises
8 min
Data migration plan to IBM FlashSystem 7300 without surprises
Data migration plan to IBM FlashSystem 7300: how to prepare consolidation, migrate in waves and set up latency monitoring to avoid instability.
IBM FlashSystem 7300 data migration planstorage consolidation
Sales AI assistant in a closed contour: implementation
8 min
Sales AI assistant in a closed contour: implementation
A closed‑contour sales AI assistant suggests the next step and generates conversation summaries while keeping client data private inside your infrastructure.
closed‑contour sales AI assistantconversation summary for sales
FC SAN Zoning: Safe Practices for Brocade and Cisco MDS
8 min
FC SAN Zoning: Safe Practices for Brocade and Cisco MDS
FC SAN zoning: practical rules for Brocade and Cisco MDS to safely make changes and reduce the risk of downtime and errors during maintenance.
FC SAN zoningBrocade zoning rules
Multi-organization in a single system: holding company and branches
7 min
Multi-organization in a single system: holding company and branches
We explain how to set up multi-organization in a single system: holding and branches, shared directories, data boundaries, access and reporting without confusion.
multi-organization in one systemholding and branches structure
Aruba CX 6300 for the access layer: PoE, uplinks and acceptance testing
8 min
Aruba CX 6300 for the access layer: PoE, uplinks and acceptance testing
Aruba CX 6300 at the access layer: how to choose PoE budget and uplink ports, and which acceptance tests to run for reliable telephony and Wi‑Fi.
Aruba CX 6300 access layeraccess switch for telephony and Wi‑Fi
Replacing Storage without Downtime for Lenovo ThinkSystem DM Series
8 min
Replacing Storage without Downtime for Lenovo ThinkSystem DM Series
Step-by-step scenario for replacing storage without downtime using Lenovo ThinkSystem DM Series: network prep, migration methods, failover tests and latency control.
storage replacement without downtimeLenovo ThinkSystem DM Series all-flash
Kubernetes backup for stateful services: choosing tools and testing restores
8 min
Kubernetes backup for stateful services: choosing tools and testing restores
Kubernetes backup for stateful services: compare Velero, Kasten and Portworx, choose storage and learn how to regularly test restores.
Kubernetes backupVelero for Kubernetes
Secure remote workstation for remote work: encryption
8 min
Secure remote workstation for remote work: encryption
Secure remote workstation: what to configure for encryption, data storage and peripheral control to reduce leaks and mistakes.
secure remote workstationdisk and file encryption
Universal approvals in a system: statuses and escalations
8 min
Universal approvals in a system: statuses and escalations
Universal approvals in a system: statuses, timeouts, escalations, signing and delegation — add processes without rewriting core logic.
universal approvals in the systemapproval statuses
Warranty check by serial number: Dell, HPE, Cisco
8 min
Warranty check by serial number: Dell, HPE, Cisco
Warranty check by serial number before acceptance: how to quickly verify Dell, HPE and Cisco, what is acceptable, and which discrepancies block commissioning.
warranty check by serial numberDell Service Tag warranty check
Testing Wi‑Fi and Bluetooth on Office PCs: a Measurement Plan
8 min
Testing Wi‑Fi and Bluetooth on Office PCs: a Measurement Plan
Testing Wi‑Fi and Bluetooth quality on office PCs: a simple measurement plan for rooms, sample spec requirements, an acceptance checklist and common mistakes.
testing Wi‑Fi and Bluetooth quality on office PCsWi‑Fi requirements for office specifications
Autodesk Construction Cloud in a Closed Environment: Checks Before the Pilot
8 min
Autodesk Construction Cloud in a Closed Environment: Checks Before the Pilot
Before a pilot of Autodesk Construction Cloud in a closed environment, check integrations, data storage, logging, exports and security requirements step by step.
Autodesk Construction Cloud in a closed environmentAutodesk integration checklist
DBMS Licensing for High-Availability Clusters: Budget
8 min
DBMS Licensing for High-Availability Clusters: Budget
We examine DBMS licensing for high-availability clusters: how active-passive differs from active-active, which metrics vendors count, and how to estimate the budget.
DBMS licensing for HA clusteractive-passive cluster licenses
Palo Alto PA-3200 Series Pilot: Risk-Free Monitoring
8 min
Palo Alto PA-3200 Series Pilot: Risk-Free Monitoring
Risk‑free Palo Alto PA‑3200 pilot: monitoring activation scenario, logs to collect for rule assessment, and readiness criteria for switching inline.
Palo Alto PA-3200 pilotTAP/SPAN mode for NGFW
Zabbix monitoring without subscriptions: templates, triggers, maps
8 min
Zabbix monitoring without subscriptions: templates, triggers, maps
Zabbix monitoring without subscriptions: how to configure templates, triggers and maps to see service and business risks — not just uptime.
Zabbix monitoring without subscriptionsZabbix templates
When you need a data bus: signs you’ve reached the point of no return in IT
8 min
When you need a data bus: signs you’ve reached the point of no return in IT
When a data bus is needed: signs that integrations have become unmanageable and a minimal architecture a small IT team can handle without extra complexity.
when to need a data busdata bus ESB
On-prem infrastructure for scoring and anti-fraud: what matters in hardware
8 min
On-prem infrastructure for scoring and anti-fraud: what matters in hardware
On-prem infrastructure for scoring and anti-fraud: how to choose CPU, RAM, network and storage for low latency and validate them in a pilot.
on-prem infrastructure for scoring and anti-fraudservers for ML inference
Licensing 1С and SQL Server on a Server: How Not to Overpay
8 min
Licensing 1С and SQL Server on a Server: How Not to Overpay
We analyze licensing for 1С and SQL Server on a server: important rights and limits, how to calculate, and what to check before upgrade or migration.
licensing 1С and SQL Server on a serverserver licenses when upgrading hardware
Reducing Support Requests After PC Replacement: Plan and Training
8 min
Reducing Support Requests After PC Replacement: Plan and Training
How to reduce support requests after PC replacement: prepare communications, one-page guides and a 30-minute training to keep the first days calm.
reduce support requests after PC replacementPC migration communication plan
Server for 1C: how to choose CPU, memory and disks without overpaying
8 min
Server for 1C: how to choose CPU, memory and disks without overpaying
Server for 1C: how to assess 1C, ERP and DB load, choose CPU, memory and storage, and avoid overpaying for cores. Practical examples and a checklist.
server for 1Cserver for ERP
Juniper QFX5120 for Data Centers: choosing 25/100GbE ports
8 min
Juniper QFX5120 for Data Centers: choosing 25/100GbE ports
Juniper QFX5120 for data centers: how to pick 25/100GbE ports, compatible modules and run link and latency tests before commissioning.
Juniper QFX5120 for data center25GbE port configuration
Two-Factor Authentication for Employees: An Implementation Plan
8 min
Two-Factor Authentication for Employees: An Implementation Plan
Step-by-step plan to roll out two-factor authentication for employees: choosing methods, support during the first weeks, and backup procedures without downtime.
two-factor authentication for employees2FA rollout
AI for the Legal Department: Source-backed Answers
8 min
AI for the Legal Department: Source-backed Answers
AI for the legal department: how to configure answers to be source-backed only, provide verbatim citations, forbid guesswork, and use disclaimer templates for internal services.
AI for legal departmentsource-backed answers
Mobile app for employees: MVP, offline and security
8 min
Mobile app for employees: MVP, offline and security
Employee mobile app: how to choose scenarios for an MVP, decide what to store locally, set up offline mode and protect data if a phone is lost.
mobile app for employeescorporate app MVP
24/7 Request Intake Automation: Portals, Chat, and CRM
8 min
24/7 Request Intake Automation: Portals, Chat, and CRM
Automate 24/7 request intake via portal, chats, and email: how to set up routing in CRM/Service Desk without overloading operators.
24/7 request intake automationself-service portal
Timeframes for Warranty Diagnostics and Repairs in a Contract: Structure
8 min
Timeframes for Warranty Diagnostics and Repairs in a Contract: Structure
How to fix diagnostics and repair timeframes in a warranty contract: clause structure, loaner equipment, notifications, liability and sample wording.
warranty diagnostics and repair timeframes in contractwarranty repair timeframes and liability
Fleet Management System: Automating Reports and Data
8 min
Fleet Management System: Automating Reports and Data
Fleet management system: how to collect maintenance, fuel, trip sheet and fines data so reports are generated automatically without manual entry.
fleet management systemtrip sheet automation
Disk Encryption Test Plan: BitLocker and LUKS for Database Servers
8 min
Disk Encryption Test Plan: BitLocker and LUKS for Database Servers
Disk encryption test plan for a database server: how to measure IOPS, latencies and CPU impact for BitLocker and LUKS.
disk encryption test planBitLocker performance
Migrating to Cisco Catalyst 9500 Distributed Campus Core
8 min
Migrating to Cisco Catalyst 9500 Distributed Campus Core
Migration procedure from legacy switches to Cisco Catalyst 9500 distributed campus core: change window, cutover steps, rollback and verification.
Cisco Catalyst 9500 distributed campus corecampus core migration
A Minimal API Contract for Sales and Warehouse: Entities and Events
8 min
A Minimal API Contract for Sales and Warehouse: Entities and Events
A minimal API contract for sales and warehouse: the set of objects and events that speeds up connecting new services without rewrites or data loss.
minimal API contract for sales and warehouseintegration events
Automating Delivery Routing: Windows and Contingencies
8 min
Automating Delivery Routing: Windows and Contingencies
Delivery routing automation: how to bundle orders, handle delivery time windows, and prepare a contingency plan for traffic, breakdowns and cancellations.
delivery routing automationorder bundling
Antivirus licensing for air-gapped environments: what to consider
8 min
Antivirus licensing for air-gapped environments: what to consider
Antivirus licensing for air-gapped environments: plan offline updates, repositories, asset accounting and reporting ahead of time so InfoSec faces no surprises.
antivirus licensing for air-gapped environmentsoffline antivirus updates
Open source virtualization for a government organization: specification and acceptance
8 min
Open source virtualization for a government organization: specification and acceptance
Open source virtualization for a government organization: which items to include in the specification and test protocol to validate functionality, resilience and manageability.
open source virtualization for governmentvirtualization specification
Evaluation criteria for PC and server procurement bids: weights
8 min
Evaluation criteria for PC and server procurement bids: weights
How to set weights for price, delivery time, service and documents when evaluating bids for PCs and servers so the committee can compare offers without disputes.
evaluation criteria for PC and server procurement bidstender criteria weights
Moving from VGA and DVI to HDMI and DisplayPort in a Government Organization
8 min
Moving from VGA and DVI to HDMI and DisplayPort in a Government Organization
Migrating from VGA and DVI to HDMI and DisplayPort: how to inventory ports, choose adapters and verify compatibility with projectors.
migrating VGA and DVI to HDMI and DisplayPortHDMI and DisplayPort adapters
PC Unpacking and Initial Setup Area: Warehouse Procedures
8 min
PC Unpacking and Initial Setup Area: Warehouse Procedures
How to organize a PC unpacking and initial setup area: warehouse workflow, safety, kit labeling and completeness control.
unpacking and initial pc setup zoneunpacking a batch of computers in warehouse
Unified Counterparty Directory: IDs and Merge Rules
8 min
Unified Counterparty Directory: IDs and Merge Rules
Unified counterparty directory: how to choose unique identifiers, set merge rules, and avoid duplicate customers and contracts across systems.
unified counterparty directoryunique customer identifiers
LMS for a Closed Network: How to Design Offline Training
8 min
LMS for a Closed Network: How to Design Offline Training
LMS for a closed network: how to plan content, tests, progress, reports and account synchronization without cloud dependencies.
LMS for a closed networkcorporate on-premise LMS
User Acceptance Testing (UAT) for CRM/ERP: Scenarios and Acceptance
8 min
User Acceptance Testing (UAT) for CRM/ERP: Scenarios and Acceptance
User acceptance testing (UAT) for CRM/ERP helps you accept the system without surprises: how to gather scenarios, assign business owners and record acceptance.
UAT user acceptance testing for CRM/ERPUAT scenarios
Revit Worksharing over VPN: branch offices working without conflicts
7 min
Revit Worksharing over VPN: branch offices working without conflicts
How to set up Revit Worksharing over VPN for branch offices: where to store the central file, how to avoid conflicts, disconnects and model loss.
Revit Worksharing over VPNRevit central file
OpenVAS Vulnerability Scanning: Schedules and Reports
8 min
OpenVAS Vulnerability Scanning: Schedules and Reports
OpenVAS vulnerability scanning: how to configure schedules, exceptions, prioritization and reports so scan results become real fixes.
OpenVAS vulnerability scanningGreenbone best practices
HashiCorp Vault Community: secret storage and alternatives
8 min
HashiCorp Vault Community: secret storage and alternatives
HashiCorp Vault Community: where to store keys and passwords without a paid solution, how to separate access, connect applications and CI/CD without extra risk.
HashiCorp Vault Communitysecret store
WMS development with MDT support: offline warehouse processes
8 min
WMS development with MDT support: offline warehouse processes
WMS development with MDT support: how to design receiving, putaway, picking and inventory with offline mode and fast operations.
wms development with mdt supportoffline wms
TMS Development for Trips: Statuses, Plan‑Fact, Documents
8 min
TMS Development for Trips: Statuses, Plan‑Fact, Documents
TMS development for trips: how to design statuses, plan‑fact, multi‑carrier workflows and control supporting documents without chaos.
TMS development for tripstrip statuses in TMS
Environmental requirements in technical specifications for supplying equipment for government needs
7 min
Environmental requirements in technical specifications for supplying equipment for government needs
How to write environmental requirements in technical specifications for equipment supply: packaging, packaging removal and disposal, and energy efficiency—without ambiguous wording.
environmental requirements in equipment technical specificationspackaging and disposal of packaging in public procurement
Windows licensing in VDI: options and procurement mistakes
7 min
Windows licensing in VDI: options and procurement mistakes
Windows licensing in VDI: options for thin clients and remote users, common procurement mistakes and a quick checklist.
Windows licensing in VDIVDA and Software Assurance
Revit Central Model: ACC or File Server — A Comparison
8 min
Revit Central Model: ACC or File Server — A Comparison
Revit central model: ACC or a file server — compare risks, speed, access rights and InfoSec requirements to choose the right option for your team.
Revit central model ACC or file serverAutodesk Construction Cloud for Revit
Warranty Case Management in IT Service: The Process
8 min
Warranty Case Management in IT Service: The Process
We explain warranty case management in the IT department: steps from ticket to closure, diagnostics, replacements, paperwork and repeat-failure analytics.
warranty case management in ITcompany RMA process
Civil 3D Data Shortcuts: Collaborative work without broken links
8 min
Civil 3D Data Shortcuts: Collaborative work without broken links
Civil 3D Data Shortcuts: how to set up project structure, keep links under control and avoid common mistakes when a team works in parallel.
Civil 3D Data Shortcutscollaborative work in Civil 3D
Warranty service client portal: statuses and notifications
8 min
Warranty service client portal: statuses and notifications
A warranty service client portal helps register serial numbers, view repair status and receive notifications — all without phone calls.
warranty service client portalregister serial numbers
UPS under the desk for a critical workstation: how to choose
8 min
UPS under the desk for a critical workstation: how to choose
UPS under the desk for a critical workstation: how to calculate power, choose the battery, and set up checks so the protection actually works.
UPS under deskUPS power calculation
Equipment support models: onsite, on-call visit or swap — how to choose
7 min
Equipment support models: onsite, on-call visit or swap — how to choose
How to choose an equipment support model: onsite, on-call visit or swap. We compare recovery times, costs and key contract points.
equipment support modelonsite support
KPI for Quality of Equipment Delivery with Installation: Metrics and Data Collection
8 min
KPI for Quality of Equipment Delivery with Installation: Metrics and Data Collection
KPI for quality of equipment delivery with installation: list of measurable metrics, formulas, data sources and a simple collection scheme based on tickets, acceptance acts and site visits.
KPI for quality of equipment delivery with installationrepeat engineer visits
SAST in 2025: how to choose SonarQube, Semgrep or Checkmarx
7 min
SAST in 2025: how to choose SonarQube, Semgrep or Checkmarx
SAST in 2025: how to compare SonarQube, Semgrep and Checkmarx by language support, rule and alert quality, and how to set up a quality gate without breaking development.
SAST in 2025SonarQube Semgrep Checkmarx comparison
Port description standards on switches: Cisco, Aruba, CMDB
8 min
Port description standards on switches: Cisco, Aruba, CMDB
Port description standards for switches ensure consistent labels for Cisco and Aruba and allow automatic exports to CMDB without manual confusion.
switch port description standardsport naming rules
SSO for CRM/ERP: AD/LDAP, Role MFA and Pilot Checklist
8 min
SSO for CRM/ERP: AD/LDAP, Role MFA and Pilot Checklist
SSO in CRM/ERP: how to choose between AD/LDAP options, where to enable MFA for critical roles, and what to test during a pilot.
SSO in CRM/ERPAD LDAP integration
Hot and Cold Aisles in the Server Room: Quick Measures
8 min
Hot and Cold Aisles in the Server Room: Quick Measures
Hot and cold aisles in the server room: quick measures without renovation — blanking panels, curtains, rack rearrangement and sensors, plus verification with measurements.
hot and cold aisles server roomhot aisle isolation with curtains
Enterprise Document Search Without AI: Elasticsearch, OpenSearch
8 min
Enterprise Document Search Without AI: Elasticsearch, OpenSearch
Enterprise document search without AI: how to compare Elasticsearch and OpenSearch, measure relevance, enforce access controls and speed up indexing for 10+ TB.
enterprise document search without AIElasticsearch for enterprise search
Single-socket or Dual-socket Server: How to Choose
8 min
Single-socket or Dual-socket Server: How to Choose
Single-socket or dual-socket server: we break down licensing, virtualization scale, memory size and 3–5 year TCO so you can choose without overpaying.
single vs dual-socket serverserver licensing by cores
Licensing during VM migration: vMotion and documentation
8 min
Licensing during VM migration: vMotion and documentation
Licensing during VM migrations: how software rights change with vMotion/Live Migration, which scenarios are risky and what to record in documentation.
licenses for VM migrationvMotion licensing
Hardware Root of Trust in servers: HPE, Dell, IBM checks
8 min
Hardware Root of Trust in servers: HPE, Dell, IBM checks
Hardware Root of Trust in servers: how to check HPE Silicon RoT, Dell SCV and IBM Secure Boot during acceptance and after firmware updates.
Hardware Root of Trust in serversHPE Silicon Root of Trust check
Migration from Cisco Catalyst to Aruba CX: moving VLANs, PoE and QoS
8 min
Migration from Cisco Catalyst to Aruba CX: moving VLANs, PoE and QoS
A step‑by‑step plan for migrating from Cisco Catalyst to Aruba CX: moving VLANs, PoE and QoS, a service checklist and common mistakes.
migration from Cisco Catalyst to Aruba CXmigrating Cisco VLANs to Aruba
Thin Clients for VDI: Dell Wyse and Alternatives Without Surprises
8 min
Thin Clients for VDI: Dell Wyse and Alternatives Without Surprises
Thin clients for VDI reduce support effort but can be limited by the network. We review Dell Wyse, alternatives and practical checks.
thin clients for VDIDell Wyse
Replacing a Commercial Proxy with Squid: Cache, ACLs, Logs, and TLS
8 min
Replacing a Commercial Proxy with Squid: Cache, ACLs, Logs, and TLS
Replacing a commercial proxy with Squid: migration plan, caching, ACLs, logging and TLS inspection where permitted, plus measures to avoid breaking critical web services.
replace commercial proxy with SquidSquid caching configuration
Tower or Rack Server: Which Is More Cost‑Effective for Ownership and Growth
8 min
Tower or Rack Server: Which Is More Cost‑Effective for Ownership and Growth
Tower or rack server: compare TCO, maintenance, noise and heat, room requirements and scaling to choose the right format for your organization.
tower or rack serverserver total cost of ownership
Network backup window calculation: formulas and an overnight example
8 min
Network backup window calculation: formulas and an overnight example
How to calculate a network backup window: formulas for speed, deduplication and traffic limits, plus an example to make backups run overnight.
network backup window calculationbackup bandwidth sizing
Keyboard layout requirements: Kazakh and Russian
8 min
Keyboard layout requirements: Kazakh and Russian
We examine Kazakh and Russian keyboard marking options, methods of applying characters, and how to record keyboard layout requirements in specifications, SOWs and acceptance reports.
keyboard layout requirementsKazakh keyboard layout
3-2-1 Backup: Implementation, Mistakes, and Tests
8 min
3-2-1 Backup: Implementation, Mistakes, and Tests
3-2-1 Backup: step-by-step setup of copies, choosing media, regularly testing restores and avoiding unrecoverable backups.
3-2-1 backupcompany backup plan
How to choose a task orchestrator: Airflow, Prefect or Control‑M
6 min
How to choose a task orchestrator: Airflow, Prefect or Control‑M
How to choose a task orchestrator for ETL and scheduled calculations: comparison of Airflow, Prefect and Control‑M by logging, access control, reliability and maintenance.
how to choose a task orchestratorApache Airflow for ETL
Developing a LIMS for the Laboratory: Sample Traceability and Result Release
8 min
Developing a LIMS for the Laboratory: Sample Traceability and Result Release
LIMS development for a laboratory: how to build sample traceability, barcode labeling, measurement protocols, repeat testing and result release without confusion.
LIMS development for laboratorysample traceability
Driver and Firmware Update Policy in a Government Agency
8 min
Driver and Firmware Update Policy in a Government Agency
Driver and firmware update policy: how to set up a pilot group, schedule update windows and prepare rollback so critical offices aren’t affected.
driver and firmware update policyupdate windows in government agencies
Integration of CRM, ERP and 1C: data exchange patterns and data quality control
8 min
Integration of CRM, ERP and 1C: data exchange patterns and data quality control
CRM, ERP and 1C integration: compare file, API and bus exchange methods and a data quality checklist — queues, retries, deduplication and reconciliation.
CRM ERP 1C integration1C data exchange
Service Desk Ticket Classification with LLMs
8 min
Service Desk Ticket Classification with LLMs
Classifying Service Desk tickets with LLMs: categories, model confidence, escalation rules and how to measure faster ticket handling.
Service Desk ticket classification with LLMticket escalation rules
Kubernetes Licensing: accounting for nodes, instances and support
8 min
Kubernetes Licensing: accounting for nodes, instances and support
Kubernetes licensing: how containerization changes node and instance accounting, affects CPU metrics and supported configurations, and what to check before an audit.
Kubernetes licensinglicense accounting in containers
Jitsi on‑prem video conferencing for branch offices: network, TURN, recording
8 min
Jitsi on‑prem video conferencing for branch offices: network, TURN, recording
Jitsi on‑prem video conferencing: what to check for network and NAT, when TURN is needed, how to keep audio quality, and how to set up recording and meeting rooms in branch offices.
Jitsi on-prem video conferencingTURN server for Jitsi
Power requirements for a server rack: what to request
8 min
Power requirements for a server rack: what to request
Power requirements for a server rack: which parameters to request from the building, how to check phases, breakers and grounding, and what to do before commissioning.
power requirements for server rackserver rack power
Rolling Out LibreOffice at Scale: Templates and DOCX Compatibility
8 min
Rolling Out LibreOffice at Scale: Templates and DOCX Compatibility
How to organize a large-scale LibreOffice rollout: templates, fonts, macros, DOCX/XLSX checks and rules for exchanging files with counterparties.
large-scale LibreOffice deploymentmigrating to LibreOffice without subscriptions
Server rack and heavy server delivery: how to prepare the site
7 min
Server rack and heavy server delivery: how to prepare the site
Prepare your site for rack and heavy server delivery: a checklist to check passages, elevators and floor loads before delivery so equipment doesn’t get stuck at the entrance.
server rack deliverysite inspection before delivery
Modular Monolith or Microservices: Criteria and Migration
8 min
Modular Monolith or Microservices: Criteria and Migration
Modular monolith or microservices: how to choose an approach and migrate step by step without rewriting the system, with clear checks and risk control.
modular monolith or microservicesarchitecture selection criteria
Office PCs for Mass Deployments: Comparing Dell, HP and Lenovo
6 min
Office PCs for Mass Deployments: Comparing Dell, HP and Lenovo
Office PCs for mass deployment: how servicing works for Dell OptiPlex, HP EliteDesk and Lenovo ThinkCentre — and which parts fail most often.
office pcs for mass deploymentsserviceability of corporate computers
On-prem object storage: Dell ECS vs IBM Cloud Object Storage in practice
8 min
On-prem object storage: Dell ECS vs IBM Cloud Object Storage in practice
How to choose on‑prem object storage: testing Dell ECS and IBM Cloud Object Storage for S3 API compatibility, versioning and WORM before a pilot.
on-prem object storageS3 compatibility
Standardizing Workplace Deployment: Golden Image Step-by-Step
8 min
Standardizing Workplace Deployment: Golden Image Step-by-Step
A step-by-step plan to standardize workplace deployment: build a golden image, separate drivers and software, and set up automated installation.
workplace deployment standardizationWindows golden image
Exchange Server On‑Prem vs Subscription Email: 3‑Year TCO
8 min
Exchange Server On‑Prem vs Subscription Email: 3‑Year TCO
A practical look at Exchange Server on‑prem vs subscription email: licenses and CALs, redundancy, infrastructure and a 3‑year TCO calculation for your company.
Exchange Server on‑prem vs subscription emailExchange licenses and CALs
Software Compatibility Matrix: What Breaks When You Replace Software
8 min
Software Compatibility Matrix: What Breaks When You Replace Software
A software compatibility matrix reveals hidden dependencies: functions, alternatives, compromises and workarounds you must know before replacing a system.
software compatibility matrixcorporate software replacement
Microsoft licenses in the Terms of Reference: wording for required rights
8 min
Microsoft licenses in the Terms of Reference: wording for required rights
How to correctly describe Microsoft licenses in the Terms of Reference: phrasing for upgrade, downgrade and transfer rights, and which documents to request from the supplier.
Microsoft licenses in TORTOR wording for Microsoft software
Calculating SIEM License Costs: EPS, GB per Day, and Retention
8 min
Calculating SIEM License Costs: EPS, GB per Day, and Retention
We show how to calculate SIEM license costs by EPS and GB per day, estimate storage and add growth buffer so you don’t hit limits in six months.
SIEM license cost calculationEPS in SIEM
Electronic Signatures and Secure Tokens: IT Deployment
8 min
Electronic Signatures and Secure Tokens: IT Deployment
Electronic signatures and secure tokens: what to prepare at workstations, how to manage certificates, and how to organize backup and support in the first months.
electronic signature and secure tokenscertificate management for e-signatures
Open Source Migration Map for the IT Director: Layers and Risks
8 min
Open Source Migration Map for the IT Director: Layers and Risks
An open source migration map: how to break a software replacement into layers, record success criteria, timelines and owners, and spot risk areas in advance.
open source migration mapcommercial software replacement plan
DEX (Digital Employee Experience): measuring IT quality for employees
8 min
DEX (Digital Employee Experience): measuring IT quality for employees
DEX (Digital Employee Experience) helps you see where IT hinders work: which metrics to collect, how to link them to incidents and how to set priorities.
DEX (Digital Employee Experience)IT user experience metrics
Personal video communication at the workplace: a checklist for government agencies
8 min
Personal video communication at the workplace: a checklist for government agencies
Personal video communication at the workplace: a practical checklist for a government agency covering cameras, audio, lighting and reliable support without call failures.
personal video communication at the workplaceoffice video call checklist
Office power quality: measurements and equipment protection
8 min
Office power quality: measurements and equipment protection
Office power quality: what to measure, when you need stabilizers and filters, and how to tell network issues from PSU faults.
office power qualityvoltage sags
Dell PowerStore for virtualization: choosing 500T–3200T by IOPS
8 min
Dell PowerStore for virtualization: choosing 500T–3200T by IOPS
Dell PowerStore for virtualization: how to choose a model (500T–3200T) by IOPS and capacity, which spec options really help and which often don't pay off.
Dell PowerStore for virtualizationchoosing PowerStore model 500T 3200T
RDS Load Calculation: CPU, RAM and Profiles Without Queues
8 min
RDS Load Calculation: CPU, RAM and Profiles Without Queues
RDS load calculation helps choose CPU, RAM and disks, assess user profiles and run tests to avoid login queues as load grows.
RDS load calculationWindows terminal server
Terraform vs Pulumi: choosing IaC for security and environment separation
8 min
Terraform vs Pulumi: choosing IaC for security and environment separation
Terraform vs Pulumi: how to choose IaC to meet security requirements, separate dev/test/prod, and set up access control and infrastructure change audit.
Terraform vs PulumiOpenTofu for IaC
Internal Correspondence System: A Model for Tracking and Control
8 min
Internal Correspondence System: A Model for Tracking and Control
A practical model: how to set up an internal correspondence system with registration, resolutions, assignments, deadline control and department-based access.
internal correspondence systemdocument registration
Container and Image Security: Checks Without Blocking Releases
8 min
Container and Image Security: Checks Without Blocking Releases
Container and image security: how to set up scanning, policies, and runtime protection in Aqua, Prisma Cloud, and Sysdig without blocking releases and with clear exceptions.
container and image securityimage scanning in CI/CD
Standardizing Ports and Adapters for Procurement: A Checklist
8 min
Standardizing Ports and Adapters for Procurement: A Checklist
Standardizing ports and adapters for procurement: how to choose USB‑C, HDMI and DP, calculate adapters and docking stations so employees can connect on day one.
standardizing ports and adapters for procurementUSB-C for corporate laptops
Zero-downtime database migration: replication, switchover, rollback
8 min
Zero-downtime database migration: replication, switchover, rollback
Zero-downtime database migration plan: choosing replication, preparation, performance tests, safe switchover and a clear rollback plan.
zero-downtime database migrationdatabase replication