Direct turnkey supplier · since 2011
One supplier instead of twenty
Server room, open pit, operating room, PPE store. Whatever your operation runs on, we ship it direct from the factory and hand it over ready to run. Logistics, certification, installation and service are already in the contract.
One contract, one warrantyPublic procurement and tenders
GSE·MINOpen-pit fleet and ore processing
- founded
- 2011founded
- specialists on staff
- 500+specialists on staff
- projects delivered
- 1000+projects delivered
- cities with field service
- 15cities with field service
- offices: Almaty, Santa Clara, Shenzhen, Warsaw
- 4offices: Almaty, Santa Clara, Shenzhen, Warsaw
The problem
Twenty suppliers: twenty contracts, twenty deadlines, twenty excuses
A large company’s procurement team juggles dozens of contractors. Each one answers for its own box. When the equipment won’t start, nobody is to blame.
- Servers and storage for the data centerSupplier 01GSE
- Haul truckSupplier 02GSE
- Mill linersSupplier 03GSE
- CT scanner for a regional hospitalSupplier 04GSE
- Medical waste incineratorSupplier 05GSE
- PPE for 1,200 employeesSupplier 06GSE
- Office software licensesSupplier 07GSE
- Pumps for the tailings facilitySupplier 08GSE
One contract, one schedule, one warranty and one person accountable for the result.
What we supply
We supply everything your operation runs on
Eight areas, and the list grows with every contract. We ship every item direct from the manufacturer and see it through to start-up.
- GSE·ITGSE·ITIT infrastructure and data centersData centers, servers, networks, security, AI clusters
- GSE·CMPGSE·CMPComputing hardwareGSE PCs, servers and all-in-ones, laptops, peripherals
- GSE·SWGSE·SWSoftwareLicenses, domestic software, Activity Control
- GSE·INDGSE·INDIndustrial equipmentPumps, drives, power, instrumentation
- GSE·MINGSE·MINMining and ore-processing equipmentOpen-pit fleet, crushing, processing, spare parts
- GSE·MROGSE·MROMRO supplies and consumablesPPE, fuels and lubricants, fasteners, electrical, chemicals
- GSE·MEDGSE·MEDMedical equipmentCT and MRI, operating rooms, intensive care, labs
- GSE·ECOGSE·ECOEcology and waste disposalIncinerators, gas cleaning, treatment plants
Delivery route
From the manufacturer’s plant to start-up at your site, in one line
You hand us the brief. Every stage after that is ours, and we answer for each one.
- 01
Sourcing from the manufacturer
We find equipment to your spec, compare manufacturers and get the price straight from the factory.
Specification with price and lead time
- 02
One contract
Price, lead time, warranty and accountability for the whole delivery in one document. We work through tenders and public procurement.
One contract for everything
- 03
Logistics and customs
We ship from Europe, China and the US by sea, air, rail and road. Customs and cargo insurance are on us.
Delivered to your site
- 04
Certification and permits
We obtain ST-KZ and EAEU certificates, medical device registration certificates and environmental permits.
Documents for acceptance
- 05
Installation and commissioning
We install, connect and start up. Then we train your staff to run the new equipment.
Commissioning certificate
- 06
Warranty and service
Warranty and post-warranty service, spare parts and field engineers in 15 cities across Kazakhstan.
Engineer on site within 48 hours
Ways to work
Four ways to work with us
- 01
Supply on request or by tender
Send the specification or the lot number. We’ll prepare the offer and the full document package for your bid.
- 02
Turnkey facility
Data center, operating suite, processing section, waste disposal site: we design, source, install and hand it over.
- 03
Framework supply
Consumables, spare parts and PPE at fixed prices on a set schedule. One request, and your stores are stocked.
- 04
Service contract
We take your equipment into service: scheduled maintenance, repairs, spare parts and a report for every site.
GSE in numbers
15 years of taking every delivery to start-up
- specialists on staff
- 500+specialists on staff
- projects handed over to clients
- 1000+projects handed over to clients
- countries we ship equipment from
- 15+countries we ship equipment from
- production sites
- 3production sites
Permits and certificates
We handle the paperwork your equipment can’t be accepted without
In Kazakhstan, deliveries hinge on permits. We know every one of them inside out and prepare them ourselves while the equipment is in transit.
- NCELS
Healthcare
NCELS registration certificate. Without it, a device cannot be imported, sold or bought through public procurement.
- IEP
Ecology
Integrated environmental permit, state environmental review and environmental insurance.
- GWS register
Subsoil use
Qualification in subsoil users’ procurement systems and local content tracking.
- ST-KZ
IT and hardware
ST-KZ certificate, the trusted products register and domestic manufacturer status.
In-house manufacturing
Computers and servers we build ourselves
The GSE L200, S200 and M200 lines are assembled in Kazakhstan and carry domestic manufacturer status. In public procurement, that advantage works for you.

Projects
We did it for them. We’ll do it for you
Ministries, data centers, schools and telecom operators. Volumes most suppliers can’t handle.
All projects
Public sector
IT infrastructure upgrade for government bodies
A ministry moved to domestically produced GSE hardware with central management and SLA-backed support.

Enterprise
A Tier III enterprise data center
We designed and built a data center for a major holding company: engineering systems, virtualization and disaster recovery.

Education
Equipping Kazakhstan's schools and universities
We delivered and installed computers in schools and universities nationwide, with service and a 3-year warranty.

Geography
Service wherever your equipment runs
Engineers in 15 cities across Kazakhstan and a central service hub in Almaty. Our offices in Santa Clara, Shenzhen and Warsaw sit close to the manufacturers’ plants.
Almaty, Kazakhstan
Head office, manufacturing, central warehouse and service hub
Santa Clara, USA
Working with technology manufacturers
Shenzhen, China
Factory relations and quality control
Warsaw, Poland
European supply and EU logistics
Manufacturers
Global brands, shipped to you direct
Questions
What clients ask before the first contract
Will you really supply both servers and a haul truck?
Yes. In every area we work directly with manufacturers and build the delivery around your specification. For you, it’s one purchase instead of ten.
Why use a middleman when you can buy from the factory?
The factory ships from its own gate. We bring the equipment to your site, clear customs, certify, install, commission and service it. You pay the factory price and get the work your own people would otherwise have to do.
Do you bid in public procurement and subsoil users’ tenders?
Yes. We prepare the full document package, including ST-KZ and local content data, and bid on the public procurement portal and in subsoil users’ procurement systems.
What if the equipment breaks down?
Call us. We handle the warranty and service on the delivery ourselves: an engineer is on site within 48 hours in any of our 15 cities. Spare parts and dealing with the factory are on us.
How long does delivery take?
We fix the lead time for every item in the contract. Stock items arrive in days, made-to-order equipment follows the factory schedule, and you see every stage.
Where do we start?
Send a specification, a technical brief or just a list of what you need. A manager will contact you, clarify the details and come back with an offer.

Request
Send the specification. We’ll do the rest
One item or a turnkey facility, in any area. One manager runs your delivery from the first call to the commissioning certificate.
Free quoteDocuments for public procurement and tendersOne contract, one warranty










